A VFX render farm sized to the deadline, not the year
Studio work is a week of nothing and then a deadline that needs forty cores of render time by Friday. Meshive spins up whole GPUs for the crunch and lets you switch every one of them off the day the delivery ships.


Client work sets the fleet size, not a subscription tier
Ten pods for a sequence this week, one for revisions the next. Nothing is reserved between jobs, so a quiet month costs nothing.

Render and generate on the same account
Blender Cycles for the render queue, ComfyUI for the generative shots that used to go to a different vendor. One bill, one platform.

Whole cards, predictable frame times
A shared GPU turns a bid into a guess. Meshive gives every pod a whole card, so the test frame's time is the sequence's time.
The technical side of this work
Media, VFX & 3D studios runs on Meshive's 3D rendering setup — templates, model packs and the exact workflow.
A render farm you can switch offCards that suit this work
Every pod gets a whole, non-virtualized GPU, so the test frame’s time is what the sequence will cost.
- RTX 4090The card a per-frame bid is usually built on
- RTX PRO 5000 BlackwellClient scenes with full-resolution textures loaded
- RTX 6000 AdaMatches the workstation your artists already sit at
- RTX PRO 6000 BlackwellThe 8K hero shot, the night before delivery

Three steps
- 1Start the Blender template, or bring your own render image.
- 2Attach a volume for the project file, assets and output frames.
- 3Scale to as many pods as the deadline needs, then switch every one off.

Pick a card and start the pod
Sign up, choose the GPU, and the pod is yours in under two minutes. It bills by the hour and stops when you stop it.
Already a user? Invite friends and earn 15% of their first top-up.



